GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
34
113836_37_38_39R Revision date: 06.06.18
INSTALL OVERLAP BRACING AND U-CHANNEL — continued
NOTE:
Do not climb on panels to install screws. Take
steps to protect panels during screw installation.
6. Repeat steps as needed to cut and attach additional
1.5" x 1.5" square tubes to secure overlap seam of all
panels.
Install one tube per overlap as shown.
7. Install an additional Tek screw and washer at end of
H-channel if needed to secure channel to rafter. See
photo in Step 5.
8. Continue with next procedure.
View from outside of the shelter.
Upper Panel
Installed 104213
U-Channel
Lower Panel
Step 7
Drive FA4484B Tek screw with 102921 neo-bonded
washer through U-channel, both panels, and into the
1.5" x 1.5" square backer tube.
Space screws at 12" on-center.
Actual frame may differ from example shown.
Inside
Greenhouse
Outside
Greenhouse
104213
U-Channel
Lower
Panel
104779 Backer Tube
(inside greenhouse)
Upper
Panel
FA4484B Tek Screw &
102921 Neo-Bonded Washer
FRAME CHECK
Before you attach the roll-up curtain, inspect the frame for
sharp edges or fasteners that could damage the curtain or
kit components.
1. Verify that all frame members are properly secured.
2. Verify that all bolts and clamps are tight.
3. Recheck the frame assembly for sharp edges or
clamps and bolts that may interfere with the installation
of the curtain. File or tape sharp edges as needed.
4. Reposition clamps and bolts as needed and tape all
rafter pipe joints with duct tape to protect the curtain.
5. Verify that the main building frame is properly and
adequately anchored.
Do not attach the roll-up curtain to an unanchored
frame.
6. Continue with the next section.
5. With tube aligned and someone holding it in place
inside the greenhouse, drive FA4484B Tek screws with
neo-bonded washers through from the outside into the
1.5" x 1.5" backer tube.