39
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 06.06.18 113836_37_38_39R
11. Using an FAH005B (1/4" x 2") carriage bolt and
FALB01B nut, attach square shaft to a tubing adapter.
12. Slide square shaft through Twist-of-the-Wrist gearbox.
TWIST-OF-THE-WRIST ASSEMBLY (CONTINUED)
13. Slide Twist-of-the-Wrist assembly onto channel from
the ground end. (This is the free end of channel.)
15. Attach conduit to square shaft of assembly by inserting
another FAH005B carriage bolt through hole in conduit
and tubing adapter. Add and tighten FALB01B nut.
NOTE:
Adjust channel on threaded rod or cut conduit
to length or both to achieve desired fit.
16. Attach crank handle to Twist-of-the-Wrist assembly.
(End panel is not shown in the above diagram.)
17. Test operation and repeat steps for the remaining
assembly.
NOTE:
If panel rolls in the desired direction, but you
want to turn the crank in the opposite direction for the
same result, unbolt, reposition gearbox, and remount it
on
the same side of mounting bracket
. See above.
18. After installing both roll-up side panel assemblies,
continue with the next procedure.
14. Finish rolling conduit clockwise up to the Twist-of-the-
Wrist assembly.