4000 Series
Page
40
of
41
3460006-17_serial series 5000000
Water cooled condenser manually test or flushing the valve (Water cooled only 4102/4105)
The water-cooled condenser water regulating valve should be inspected every six (6) months. This is a
visual and operational inspection, complete the following steps:
1. Turn off power to the freezer.
2. Remove side panel cover (20 screws)
3. Manually flush the valve and piping before and after installing, repairing, or replacing a valve to
remove filings, chips, or other foreign matter. Manual flushing does not affect valve adjustment. To
flush the valve, insert screwdrivers under both sides of the valve spring guide and lift upwards. (see
figure 1 below)
12.0 Factory Default Watlow Settings
Included on the flash drive is a PDF copy of the factory loaded Watlow Configuration. The file is
in the “Farrar Scientific Model 4002 Documentation” folder on the flash drive. All highlighted text
needs to be verified in the unit configuration before operation of the equipment. Not all
parameters listed in this printout are active, dependent on higher priority settings. While
connected to the unit using EZ-Zone Configurator, pertinent settings will be in
bold
, while
settings that are not active for that operation type will be
grey.
Important information for your future reference and when contacting Farrar Scientific
or local Distributors. Please have the following information readily available: