3
INSERT LIFT HANDLE
INTO HEAD ASSEMBLY
Insert the end of lift handle hole into the post on the head assembly.
Lift the head assembly off the floor and hook it into the “up” position.
3.0 - HOW TO INSERT THE LIFT HANDLE
4
LOAD THE
FLOORING PRODUCT
Place the factory 5 gal pail/BIB container on the base of the machine.
Insert the suction hose into the pail/ container.
The metal suction filter at the end of the suction hose should be flat on the
bottom of the container.
4.0 - HOW TO LOAD THE PRODUCT
SIMPLY INSERT THE
TUBE DIRECTLY INTO THE
FACTORY CONTAINER.
NO TRANSFER REQUIRED!
A
B
A
B
C