www.fassride.com
(866) 769.3747
STEP 3:
MOUNT FUEL SYSTEM
C.
Assemble PFB-2002 and RS-2001C RS will make contact with bed channel when assembled correctly.
Insert the PFB-2002 assembly in to bed channel align the nut with the opening on the channel.
D.
Secure PFB-2002 and RS-2001 with (1) hex bolt 1/2” -20 x 1 1/2” and (1) 1/2” washer to PFB-2002C