Installation
HA180
V. 2.0
28
4.2
Put the machine in position
4.2.1
Move the machine to the final location, with a ramp (optional)
1. Optionally, place the ramp (A).
2. Move the machine from the pallet on to the ground.
3. Move the machine to the final location.
4. Connect the power cable to the net entry.
WARNING
Mind the minimum requirement of the load
capacity of the floor. See
.
WARNING
Do not use a forklift.
Note
Make sure that the final location is well-lit and well-
ventilated.
Make sure that the surface of the floor is
horizontal.
A
CAUTION
Do not connect the power cable to the wall
socket.