11
www.fastTT.bike
FastTT Aero Bar Installation Guide - TKP v8
Start by drilling a 2.5mm pilot hole for the REAR bolt in each bar from the UNDERSIDE of the
mounting base, using the marks that you placed in the previous step as your guide. Check
carefully to ensure that the marked positions are the SAME ON BOTH BARS before drilling.
Once drilled, carefully cut out a 10mm square of the Velcro around your rear pilot hole. Only
cut deep enough to cut the Velcro, trying not to gauge the carbon (a small score line in the
carbon will not affect the strength of the bar). A VERY sharp craft knife, box cutter or scalpel is
recommended.
Using the 2.5mm pilot hole as a guide, drill the rear mounting hole - use 6mm drill for M5
(5mm) screws, 7mm drill for M6 (6mm) screws.
SECTION C - MARKING AND DRILLING THE MOUNTING HOLES