8.8.2 Checking, adjusting the valve clearance
Perform this maintenance work at the latest after
250 operating hours
NOTICE!
Danger of engine damage!
We recommend to have this work carried out by
trained personnel or our after sales service.
–
Before checking the valve clearance let the
engine cool down.
Protective equipment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
‘Parking the machine in secured condition’ on page 61
2.
Let the engine cool down to 20 °C (68 °F).
3.
Unscrew the fastening screws (1).
4.
Remove valve cover (2) with seal (3).
5.
Set the piston to the top dead centre position of the compres-
sion stroke.
For this purpose align the alignment mark (2) on the starter
disc to the top bore (1).
Preparations
Fig. 83
Fig. 84
Maintenance – Annually
DRP15X
82
Summary of Contents for DYNAPAC DRP15X
Page 6: ...Table of contents DRP15X 6 ...
Page 7: ...1 Introduction Introduction DRP15X 7 ...
Page 11: ...2 Technical data Technical data DRP15X 11 ...
Page 15: ...3 Concerning your safety Concerning your safety DRP15X 15 ...
Page 39: ...4 Indicators and control elements Indicators and control elements DRP15X 39 ...
Page 45: ...5 Checks prior to start up Checks prior to start up DRP15X 45 ...
Page 53: ...6 Operation Operation DRP15X 53 ...
Page 62: ...Operation Parking the machine in secured condition DRP15X 62 ...
Page 63: ...7 Loading transporting the machine Loading transporting the machine DRP15X 63 ...
Page 68: ...Loading transporting the machine Transport wheels DRP15X 68 ...
Page 69: ...8 Maintenance Maintenance DRP15X 69 ...
Page 109: ...9 Troubleshooting Troubleshooting DRP15X 109 ...
Page 116: ...Troubleshooting What to do if the engine has flooded DRP15X 116 ...
Page 117: ...10 Disposal Disposal DRP15X 117 ...
Page 119: ......
Page 120: ......