Operation
BOMAG
24
BT 60/4, BT 65/4
5.1
General
If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter "Indicators
and control elements" before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
5.2
Tests before taking into op-
eration
Note
i
During the running in time the idle speed may in-
crease because of the enhanced moveability of
the engine. Idle speeds between 1850 and 2000
min
-1
.
The running in time of the vibratory tamper is 10
operating hours.
The following inspections must be carried out be-
fore each working day or before a longer working
period.
Danger
!
Danger of accident!
Please observe strictly the safety regulations
in the corresponding section of this instruc-
tion manual!
l
Park the machine on ground as level as possi-
ble.
Check:
l
condition of engine and machine
l
fuel tank and fuel lines for leaks
l
screw joints for tight fit
Note
i
For a description of the following tasks refer to the
chapter "Daily maintenance".
l
Engine oil level, top up if necessary
l
Fuel level, top up if necessary.
Go
to
Discount-Equipment.com
to
order
your
parts