56X Setup Requirements
FBD FROZEN DISPENSER SETUP FOR FCB
562/563
564
AC
RC
WC
High Cap
AC
RC
WC
Electrical Requirements
Supply Voltage [Volt]
215 – 245 LCD readout should be +/- 2 volts of measured voltage at L1 and L2
Current Rating [Amp]
20
30
30
Incoming Pressure and Flow Requirements
Incoming CO2 (PSI)
70-72
Regulated CO2 (PSI)
22-24
Water Pressure (PSI)
85-92
Syrup Pressure (PSI)
70-72
Active charge Pressure (PSI)
28 - 30
Water Flow Rate at solution module
15oz per 10 second
Brix
13.5 - 15.0
Spacing Requirements
Top
12 inches
Sides
2 inches
Rear
2 inches
Tubing Requirements
CO2
3/8"
Water
3/8"
Syrup
3/8"
5
Summary of Contents for 56 Series
Page 9: ...Complete Header Assembly 9 Water Tank Syrup Tank Syrup Regulated CO2 ...
Page 19: ...P MAX DIAGNOSTIC FLOW CHART 19 ...
Page 20: ...Product Dispensing Valves DDV Valve ADA DDV Valve SDV Valve 20 ...
Page 31: ...31 562 563 Electrical Diagram ...
Page 32: ...32 564 Electrical Diagram ...
Page 51: ...Status Lights 51 Annunciator Pad Sold Out Light ...
Page 55: ...Remote Condenser 55 ...
Page 57: ...57 Remote Condenser Layout ...
Page 58: ...Remote Trap Layout 58 ...
Page 59: ...Remote Refrigerant Charge Matrix Heatcraft remote condenser FBD remote condenser 59 ...
Page 60: ...Product Warranty 60 ...
Page 63: ...63 ALL RETURNED PARTS MUST HAVE AN RGA AND A COMPLETED WARRANTY CLAIM FORM Product Warranty ...
Page 64: ...Thank you 64 ...