background image

INSTALLATION

070002_3_B

FGP 50/2 EVO-2

6

INSTALLATION

SAFETY

Before burner installation, clean carefully all around the area where the burner will be installed and arrange the correct
lighting of the room.

PRELIMINARY CHECKS

CHECK SUPPLY, TRANSPORT, PACKAGING, STORAGE

BURNER CHARACTERISTICS CHECK

The installation, adjustment and maintenance of the appliance must be carried out by professionaly
qualified person in compliance with the standards and regulations of the laws in force as a wrong
installation may cause damages to people, animals and things for which the Manufacturer will not be
responsable.

Before starting installation, maintenance and disassembly turn off the electrical supply and check that it is
not possible to turn accidentally the main switch on, close fuel inlet valves and make sure they could not
accidentally be opened.

CHECK SUPPLY
Check that the supply is complete and without transport damages. After removing all the packaging,
check the integrity of the contents. If in dubt do not use the burner and contact the supplier.
TRANSPORT
The transport weights of the burner and the gas train are indicated in the technical data.
STORAGE
Observe the environment temperatures which are allowed for storage and indicated in the technical data.

The packaging materials must not be abandoned as they may cause danger and pollution, but they should
be collected and left in a appropriate place.

The data plate of the burner shows:
A. the model;
B. fuel family;
C. fuel category;
D. fuel 1 pressure (if appicable, fuel 2 pressure);
E. minimum and maximum thermal power;
F. the data for electrical supply, absorbed electrical power
and electric protection degree;
G. the code;
H. the serial number.
Moreover the data plate includes CE labeling and the list
of countries where the certification is applicable.

Check that the capacity of the boiler is within the operating range of the burner.

Violation, removal or loss of the data plate of the burner and any other components compromise the
correct identification of the burner and hinder the installation and maintenance operation.

WA R N I N G

WA R N I N G

WA R N I N G

WA R N I N G

WA R N I N G

WA R N I N G

Summary of Contents for FGP 50/2 EVO-2

Page 1: ...FGP 50 2 EVO 2 Installation use and maintenance instructions 070002_3_B LIGHT OIL BURNERS AT TWO STAGES...

Page 2: ..._____ 7 BOILER PLATE ____________________________________________________________________ 7 FLAME TUBE LENGTH _______________________________________________________________ 7 HYDRAULIC SYSTEM HYDRAUL...

Page 3: ...e in accordance with current regulation In case of non compliance contact the manufacturer MODEL FGP 50 2 EVO 2 Flow min 1 st min 2 st max 2 st kg h 9 9 20 53 1 Thermal power min 1 st min 2 st max 2 s...

Page 4: ...HARACTERISTICS 070002_3_B FGP 50 2 EVO 2 3 DIMENSIONS MM TC TL Please see chapter Flame tube length Fig 2 Dimensions MODEL A B C D E F O P FGP 50 2 EVO 2 187 314 150 558 417 100 207 200 O P A B C TC T...

Page 5: ...ATION For the installation of the burner to the generator follow to the diagram shown below Fig 3 Burner installation LEGEND 1 Generator 7 Pipe connection 2 Counterflange 8 Screw 3 Stud bolt 9 Burner...

Page 6: ...ce handbook supplied with the present instructions After a non alterable lockout the red signal lamp in the lockout reset button pos 2 lights up By pressing the lockout reset button pos 2 for more tha...

Page 7: ...the integrity of the contents If in dubt do not use the burner and contact the supplier TRANSPORT The transport weights of the burner and the gas train are indicated in the technical data STORAGE Obse...

Page 8: ...flame tube and front door with refractory material This protection material must not impede flame tube extraction For different flame lengths please contact our Technical Sales Department The burner i...

Page 9: ...on the return pipe through the pressure regulator pos 3 SAFETY TIME After about 5 10 secs from excitation of the 1st stage valve V1 if the light oil does not ignite the burner stops lock 3RD PHASE 2ND...

Page 10: ...rms of security especially check Electrical supply The tightness of the plant and its correct realization The presence of water in the plant The ventilation of the boiler location The correct function...

Page 11: ...analyser NOZZLES G P H PRESSURE FLOW HEAD ADJUSTMENT AIR OPEN 1st STAGE AIR OPEN 2nd STAGE I 60 II 45 bar kg h NOTCH N NOTCH N NOTCH N 2 50 2 50 13 20 1 0 5 2 5 3 00 3 00 12 24 1 1 3 5 3 50 3 50 11 28...

Page 12: ...t the head group without removing the burner from the boiler a Take off the cover pos 9 by loosening the 3 screws pos 10 b Loosen the connection pos 7 and the screws pos 8 c Take out the head group po...

Page 13: ...MAINTENANCE 070002_3_B FGP 50 2 EVO 2 13 ELECTRODES POSITIONING Fig 13 Electrode positioning LEGEND 1 Disc Nozzle distance 8 mm 2 Distance between the electrodes 4 mm 3 Disc Electrodes distance 4 mm...

Page 14: ...the an open contact in the main switch or the meter overload release or no voltage in the line 3 Close the contact of the switches or wait for voltage to be supplied again 4 The thermo stats line was...

Page 15: ...e them 3 The ignition transformer cables are not well connected 3 Fasten them 4 The ignition transformer is cut off 4 Replace it 5 The electrode faces are not at the right distance 5 Adjust them to th...

Page 16: ...97000 _ Fax 39 0442 97299 www fbr it _ email fbr fbr it The illustrations and data here shown are indicative F B R Bruciatori S r l reserves the right to bring without any obligation of warning any ch...

Reviews: