SECTION 9
9-12
SERVICE AND REPAIR
REASSEMBLY AND INSTALLATION
OF OPERATING CYLINDERS
Reassemble and install the operating cylinders in the
approximate reverse order of disassembly.
DESCRIPTION OF THE PACKER
PANEL
The packer panel works in conjunction with the carrier
panel and four operating cylinders to make up the com-
paction mechanism. The packer panel is hinged to the
carrier panel and is controlled by the operating cylin-
ders. Rollers supporting the two panels move along a
track inside the tailgate.
The packer panel sweeps forward through the hopper
picking up the refuse and, together with the carrier panel,
moves the refuse forward into the body where it is com-
pacted against the pushout panel.
BEARING PLACEMENT
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Move the packer panel lever outward to fully ex-
tend the packer panel cylinders and put the panel
in the “home position”.
Raise the tailgate for access to the bearing through-
bolts. Support the tailgate with stands prior to loos-
ening through-bolts.
1.
2.
PACKER
PANEL
LEVER
PACKER PANEL
BEARING
HOUSINGS
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...