SECTION 9
9-14
SERVICE AND REPAIR
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Shift the control levers and cycle the panels as nec-
essary to align the upper and lower rollers with the
track holes.
3.
NOTE:
If the top roller is removed, first place a wedge between
the carrier panel and the partition sheet to take the
weight off the roller assemblies. If the bottom roller is
removed, support the carrier and packer panel assem-
bly before removing the roller.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Remove one roller at a time.
Replace any roller that is excessively worn, cracked
or out of round. Inspect the condition of the track
bar.
Replacement rollers should be installed with the
original shims or the same amount of new shims. A
grease fitting should be installed in the replacement
roller.
4.
5.
6.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Repeat step 1 to determine if additional shims are
required.
7.
Do not over shim rollers. Excessive shimming may
damage the tailgate walls or wear the track chan-
nels.
TRACK HOLES
SHIMS
ROLLER
GREASE FITTING
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...