SECTION 9
9-25
SERVICE AND REPAIR
DISASSEMBLY AND INSPECTION OF
MAIN CONTROL VALVE
Wash the valve body with solvent to prevent con-
tamination.
1.
NOTE:
Before disassembly, it is suggested that each work sec-
tion be marked numerically to avoid incorrect assem-
bly.
To separate valve sections from the inlet or outlet
covers, remove the four (4) tie bolts which secure
the valve sections and covers. Separate carefully,
noting the location of o-ring seals.
Thoroughly clean the o-ring counterbores and
ground surfaces of each section.
2.
3.
REASSEMBLY OF MAIN CONTROL
VALVE
Replace work sections and covers with the tie bolts
in the same order in which they were removed.
Secure tie bolts and tighten evenly to 25 ft. lbs. (33.8
Nm.).
Torque 3800 PSI relief cartridge to 20 ft. lbs. (27
Nm.).
NOTE:
Use care in replacing the work sections to avoid dis-
lodging o-rings from the counterbores.
1.
2.
3.
TIE BOLT
INLET
COVER
BONNET
KNOCKOUT
POSITIONER
OUTLET
COVER
CONTAINER
HANDLING
SECTION
PACKER
SECTION
CARRIER
SECTION
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...