SECTION 9
9-39
SERVICE AND REPAIR
INSTALLATION OF HYDRAULIC
PUMP
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Install pump in the reverse order of removal.
Be sure to install any shaft guards that may have
been removed.
1.
2.
NOTE:
The pump suction line (tube and hose) will also be filled
with hydraulic fluid. The pump and line may be drained
into an absolutely clean container and the fluid poured
back into the tank.
NEW PUMP PREPARATION
Before installing a new pump, refer to Sec. 6, PRE-
VENTIVE MAINTENANCE and the following. This will
prevent contamination of the new pump.
Remove and clean the hydraulic strainer (1).
Change the filter element (2).
Drain and flush the hydraulic tank as described in
Sec. 6, PREVENTIVE MAINTENANCE (3).
Clean the magnetic ring (4).
1.
2.
3.
4.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
TESTING A NEW PUMP
After installing a new pump, check for correct cycle time
and main line pressure as described in Sec. 7, CHECK-
OUT.
PRESSURE
SUCTION
1
2
3
4
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...