OPERATION
START UP
(OPERATING INSTRUCTIONS)
1. Inspect and start the truck as described in the pre-
operational walk-around inspection.
2. Engage the Pump/PTO control (to start the hydraulic
pump).
3. Place the engine speed up switch in the ON position.
ENGINE
ENGINE
SPEED-UP
SPEED-UP
SYSTEM
SYSTEM
ON
OFF
SECTION 3
3-11
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...