SECTION 9
9-2
SERVICE AND REPAIR
TEST FOR LEAKING PACKER PANEL
CYLINDERS
NOTE:
Before testing any cylinder, make sure the main sys-
tem pressure is correct as described under MAIN LINE
PRESSURE CHECK, Sec. 7, CHECK-OUT PROCE-
DURES.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Remove the top covers over the operating cylin-
ders for better accessibility during testing.
1.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Shift the packer panel lever outward to fully extend
the packer panel cylinders.
2.
NOTE:
Engine speed-up only activates when carrier panel le-
ver is activated.
Loosen the hydraulic fittings slowly to release any
trapped pressure. Watch for inadvertent movement
of components.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Disconnect and plug the lines to the rod end of one
cylinder at a time.
3.
PACKER
PANEL
LEVER
PACKER PANEL
CYLINDERS
PLUG
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...