SECTION 9
9-4
SERVICE AND REPAIR
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Shift the packer panel lever inward to apply hydraulic
pressure to the rod end of the packer panel cylin-
der. Hold the lever and observe the fluid flow from
the port on the case end of the cylinder. The flow of
hydraulic fluid should be no more than 2 fluid ounces
per minute. A flow greater than 2 ounces indicates
an excessive piston seal leak. Disassemble the
cylinder and replace the piston seal as described
later in this section.
8.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
If the cylinder does not leak, reconnect the hydrau-
lic lines to the cylinder and tighten to 110 Ft. Lbs.
Repeat steps 7-9 for the other cylinder.
PACKER
PANEL
LEVER
OBSERVE
FLUID FLOW
TEST FOR LEAKING CARRIER
PANEL CYLINDERS
9.
NOTE:
Before testing any cylinder, make sure the main line
pressure is correct as described under MAIN LINE
PRESSURE CHECK, Sec. 7, CHECK-OUT PROCE-
DURES.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Remove the top covers over the operating cylin-
ders for better accessibility during testing.
1.
CARRIER PANEL
CYLINDERS
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...