background image

3X4M LARGE CAGE

CAGE 4M

PART LIST DIMENSION

QUANTITY

NO. 1

1263MM

16

Box - 1

NO. 2

1263MM

4

Box - 1

NO. 3

1080MM

4

Box - 1

NO. 3a

1080MM

4

Box - 1

NO. 4

1128MM

8

Box - 1

NO. 5

1263MM

4

Box - 1

NO. 6

775MM

4

Box - 1

NO. 7

1170MM

8

Box - 1

NO. 8

425MM

1

Box - 3

NO.9

1000MM

1

Box - 3

NO.10

1000MM

1

Box - 3

Page 1 of 7

Summary of Contents for 3X4M LARGE CAGE

Page 1: ...N QUANTITY NO 1 1263MM 16 Box 1 NO 2 1263MM 4 Box 1 NO 3 1080MM 4 Box 1 NO 3a 1080MM 4 Box 1 NO 4 1128MM 8 Box 1 NO 5 1263MM 4 Box 1 NO 6 775MM 4 Box 1 NO 7 1170MM 8 Box 1 NO 8 425MM 1 Box 3 NO 9 1000MM 1 Box 3 NO 10 1000MM 1 Box 3 Page 1 of 7 ...

Page 2: ...IE SHEET NUMBER QUANTITY NUMBER QUANTITY 14 8 Box 3 15 8 Box 3 16 4 Box 3 17 4 Box 3 18 4 Box 3 19 24 Box 3 20 24 Box 3 21 Plastic tie 250 Box 3 WIRE MESH box 2 2 DIMENSIONS 1 1X20M ROOF COVER AND ACCESSORY Following parts are for the optional cover ROOF COVER 1 26 Roof support Bar 2 BOX 3 Page 2 of 7 ...

Page 3: ...We advise having cable ties available to help keep wire mesh in place when you are fitting it Page 3 of 7 ...

Page 4: ...rst poles 1 make up the sides running from front to back and the middle two horizontal bars with poles 4 making up the sloped sides and pole 5 the front and back horizontal bars Lay all roof parts on the floor and connect like below with connector part 14 and 15 Page 4 of 7 ...

Page 5: ...No 3a leg 3 at both ends leg 3a in the middle STEP III Repeat step II lift up and install the other legs STEP IV Create ground frame Install ground tubes as below illustration part no 7 bracing bars can now be fixed in each corner see earlier picture Page 5 of 7 ...

Page 6: ... the frame and from underneath the frame in line with holes on tube 5 screw tube 8 in the same way STEPVI Link the net as below illustration and put cover on last Cable tie the sections of mesh to the frame before cutting to size The long wire threads can be used to lace overlapping parts of the mesh together or further secure the mesh to the edges of the frame Page 6 of 7 ...

Page 7: ...mesh must be pulled as tightly as possible across the top and secured around the top edge with cable ties This will stop any give in the mesh and stop water building up on the cover which may cause damage to the cover or supporting poles Where the mesh overlaps this should also be fixed together at the tightest point with cable ties to stop water being able to build up Page 7of 7 ...