ABOP 6, 10, 13-2
All rights reserved by FEIN, especially in case of industrial rights registration.
FEIN retains all rights of disposal, such as copying and circulation.
C-SC_CSSM
2012.08
65/69
Version 1
7. Assembly
1. Fit drill chuck and screw in place.
2. Clamp socket wrench in drill chuck.
3. Firmly hold drill shaft with open-ended spanner.
4. Screw down drill chuck.
Tightening torque = 35 Nm.
Tool:
-Open-ended spanner, 17 mm (width
4 mm)
6 29 03 002 00 9
-Socket wrench
-Torque wrench