FEIN Repair Tools
All rights reserved by FEIN, especially in case of industrial rights registration.
Any power of disposition such as copying and right of transfer is situated with FEIN.
Henne / MVK 06 / 06
Sahre / MVK 12 / 08
8/75
2.4.
Repair intervals (maintenance intervals)
Approx. every 250 000 screw connections:
•
Clean and regrease motor pinion and bearing axles on planetary
gears.
Warning:
Slide planetary gears back onto the same wheel
axles and with the same side facing the planetary
carrier.
•
Blow electronics with dry compressed air
•
Clean motor housing
•
Check head
•
Check LEDs
Approx. every 500.00 screw connections:
•
Replace grooved ball bearing
(200)
Approx. every 2 million screw connections:
•
Replace EC motor
(10)
, repair if broken down.
EC motor
(10)
is maintenance-free.