background image

Figure 2: Pop up drain

 

Summary of Contents for Boracay Series

Page 1: ...oor Before You Begin Observe all local plumbing and building codes Unpack and inspect the bath and components for damage Put the bath and components back to the carton until installation To simplify future maintenance make sure all plumbing connections around the bath are easily accessible Carefully move the bath into the installation area Two persons are needed to install this product This bath i...

Page 2: ...ay down the bath on one side on top of a drop cloth mat in the installation location aside from the drain pipe on the floor Figure 1 Drain pipe on the floor Dry fit the drain assembly to the bath and apply 100 silicone sealant to the connection Usually it needs 24 hours to dry Please follow your plumber s advice accordingly on this part The PVC drain assembly is extendable so it can reach the drai...

Page 3: ...Figure 2 Pop up drain ...

Page 4: ...Figure 3 PVC drain assembly Option one ...

Page 5: ...osition the bath over the drain on the floor Close the bath drain Fill the bath to the overflow and check for leaks If everything is ok apply a thin continuous layer of clear or color matched 100 silicone sealant to the seam between the bath and the finished floor Care and Cleaning For best results keep the following in mind when caring for your FerdY product Always test your cleaning solution on ...

Page 6: ...lease contact a local solid surface repair professional NOTE We recommend wet sanding to extend the life of the sandpaper although dry sanding will produce the same quality repair NOTE Use 600 grit sandpaper to remove scratches and stains Apply flat even pressure with the sandpaper and move the paper in a circular pattern Inspect your progress frequently to ensure a quality repair Clean or replace...

Reviews: