7
1.5
Components
1.
Cable glands:
2.
DC Brakers
3.
Fuses & Fuse holders
1.6
Connections
Connections for SSOs:
1.
8 x
PE
(max 6 mm²)
2.
8 x
L-
(1
–
10 mm²)
3.
8 x
L+
(1
–
10 mm²)
Connections for DC nanogrid:
1.
1 x
PE
(max 25 mm²)
2.
1 x
L-
(max 25 mm²)
3.
1 x
L+
(max 25 mm²)
1.7
Inlets and cable glands
Amount
Gable glands
Cable diameter (mm)
8
M20x1.5
6 - 12
1
M25x1.5
13 - 18
1
M32x1.5
13 - 20
2
Installation
The installation section will take you step by step through the
process of installing a Power Distribution 8.
NOTE!
Ferroamp does not take responsibility for damages on the
product caused by incorrect or careless installation.
NOTE!
We recommend that you use end terminals for all
connection points that have multi-threaded conductors.
2.1
Required tools
•
Screwdrivers:
o
Slot drive 1x5 mm
o
Philips - TBD
•
Socket wrench
o
No. 1 - 27 mm
o
No. 2 - 32 mm
o
No. 3 - 39 mm
•
Cable peeler and cutter (1 - 120 mm²)
•
Torque wrench
•
Do not work alone. In an emergency, someone
else's presence may be necessary!
•
The electrical installation must comply with
national / local laws and regulations,
appropriate
standards
and
applicable
requirements from recognized organizations.
•
The electrical installation must be carried out
by a qualified installer and in accordance with
the applicable electrical standard.
•
Ensure that the location of the Power
Distribution 8 never is an obstacle to an
emergency evacuation path. In accordance
with national and local laws.
Summary of Contents for Power Distribution 8
Page 1: ...Installation manual Swe En Power Distribution 8 Rev A01 Rev B01...
Page 2: ......
Page 12: ...Electricity Reinvented...