2. Installation
2.1 General Instructions
BOILER INSTALLATION MUST ONLY BE PERFORMED BY QUALIFIED PERSONNEL, IN ACCORDANCE WITH
ALL THE INSTRUCTIONS GIVEN IN THIS TECHNICAL MANUAL, THE PROVISIONS OF CURRENT LAW, THE
PRESCRIPTIONS OF NATIONAL AND LOCAL STANDARDS AND THE RULES OF PROPER WORKMANSHIP.
2.2 Place of installation
B
The combustion circuit is sealed with respect to the place of installation and
therefore the unit can be installed in any room except in a garage. The place
of installation must be sufficiently ventilated to prevent the creation of dan-
gerous conditions in case of even small gas leaks. Otherwise there may be
a risk of suffocation and intoxication or explosion and fire. This safety pre-
caution is required by EEC Directive No. 2009/142 for all gas units, including
so-called sealed chamber units.
The unit is designed to operate in a partially protected place, with a minimum temperature of -5°C. If provided with the
special antifreeze kit, it can be used with a minimum temperature down to -15°C. The boiler must be installed in a shel-
tered place, for instance under the slope of a roof, inside a balcony or in a protected recess.
The place of installation must be free of flammable materials, objects and dusts or corrosive gases.
The boiler is arranged for wall mounting and comes as standard with a hooking bracket. Wall fixing must ensure stable
and effective support for the generator.
A
If the unit is enclosed in a cabinet or mounted alongside, there must be sufficient space for removing the casing
and for normal maintenance activities
2.3 Plumbing connections
Important
B
The safety valve outlet must be connected to a funnel or collection pipe to prevent
water spurting onto the floor in case of overpressure in the heating circuit.
Otherwise, if the discharge valve cuts in and floods the room, the boiler manufac-
turer cannot be held liable.
B
Before making the connection, check that the unit is arranged for operation with
the type of fuel available and carefully clean all the system pipes.
Carry out the relevant connections according to the diagram in cap. 4.1 "Dimensions and connections" and the symbols
on the unit.
Note:
The unit is equipped with an internal bypass in the heating circuit.
Water system characteristics
In the presence of water harder than 25° Fr (1°F = 10ppm CaCO
3
), use suitably treated water in order to avoid possible
scaling in the boiler.
Frost protection system, antifreeze liquids, additives and inhibitors
If necessary, the use of antifreeze liquids, additives and inhibitors is allowed, only and exclusively if their manufacturer
guarantees that the products are suitable for use and do not cause damage to the boiler’s heat exchanger.or other com-
ponents and/or materials of the boiler and system. It is prohibited to use generic antifreeze liquids, additives or inhibitors
that are not expressly suitable for use in heating systems and compatible with the materials of the boiler and system