9
GN2
Fig. 17
Fig. 19
Fig. 20
4.10 (Fig. 17) Using the relative pump, connect to
coupling 1 and pump in water under pressure (8 bar).
Wait a few minutes before checking that there are no
leaks. Now check that smoke retention between the
elements is correct.
Industrie FER S.r.l. declines all responsibility for damage
to persons or property caused by water or smoke leaks
from the boiler due to incorrect assembly or failure to
check retention.
Fig. 18
- Mount the following parts on the rear side of the boiler:
- four stud bolts (1)
- eight stud bolts (2) with their relative flanges (3) and
seals (4)
- Mount the collar (5) with the screws (6) and spread a
small amount of silicone (included in the kit) around the
retention seal housing on the rear end.
4.11 (Fig. 19) Mount all parts on the front side as shown
in the diagram.
4.12 (Fig. 20) Assembly detail of the servicing door and
burner hatch.