46
EN
Cod. 3542B250 - Rev. 00 - 02/2022
OMNIA S HYBRID C 3.2
7.8.5 Connections to the heat pump board
Connect the cable to the appropriate terminals as shown in the following images.
Fasten the cables securely and pass them through the relevant cable gland.
P_o - For outside circulation pump or water pump zone 1
Power supply
A1
A2
CN11
25 26
1
2 3 4 5
6
7 8 9 10
CN7
CN30
27 28
29 30 31 32
10
22
fig. 35 -
P_c - Water pump of zone 2
Power supply
A1
A2
CN11
25 26
1
2 3 4 5
6
7 8 9 10
CN7
CN30
27 28
29 30 31 32
9
21
Pumpc(zone2 pump)
fig. 36 -
SV3 - 3-way mixing valve for zone 2
SV3
9
1 0
2
18
CN11
25 26
1
2 3 4 5
6
7 8 9 10
CN7
CN30
27 28
29 30 31 32
fig. 37 -
SV2 - 3-way diverter valve for heat/cool
SV2
7 8
17
CN11
25 26
1
2 3 4 5
6
7 8 9 10
CN7
CN30
27 28
29 30 31 32
fig. 38 -
Terminals
Mode
7 (2ON)
8 (2OFF)
Heat
230V
0V
Cool
0V
230V
SG Digital inputs for smart grid input from mains electricity
If the digital inputs for photovoltaic input (not available) and smart grid from mains
electricity are enabled by parameter 15.2 (see “9.2.2 Heat pump service menu"
on page 59) and are active. They take priority over the user interface settings.
Digital inputs not enabled (default)
Set par. 15.2 = 0
Digital inputs enabled
Set par. 15.2 = 1
EVU
(photovoltaic input)
SG
(smart grid input)
Operating status
Open
Closed
Normal operation
Open
Open
Smart grid operation
•
Normal operation
In this case, the system works normally according to the set parameters
•
Smart grid operation
This operation is usually dependent of a smart grid request by the mains electricity
which basically informs the system that the deliverable electric power is decreas-
ing (for example, in the case of electricity production systems through wind or
photovoltaic farms).
The heat pump can support the system in cooling or heating mode for a specific
time (which can be set via a parameter), then it will be deactivated. Once this set
heating time has expired, only the boiler is activated. The DHW production is,
however, guaranteed by the activation of the boiler.
NOTE
If you only want to use smart grid input, jumper EVU
SMART GRID
9
2
0
3
32
25
26
27
28
31
7
1
1
2
1
9
0
1
18
8
7
5
4
2
2
2
3
2
1
2
13
3
4
6
20
14
15
17
19
16
21
6
8
9
10
5
CN4
CN22
CN5
S3
DIS1
CN24
CN1
CN2
CN6
CN8
CN13
CN15
CN16
CN18
CN28
S2
CN42
CN21
S1
S4
CN11
CN7
CN17
CN19
CN30
CN35
CN14
CN31
CN36
CN25
CN29
CN40
CN41
CL
CO
M
HT
EV
U
SG
fig. 39 -
Additional temperature probes
To control the additional system temperature probes, additional temperature
probes may be necessary (available as an accessory).
The probes are connected to the heat pump hydronic board (see “7.8.4 Heat pump
hydronic board" on page 44).
Refer to the instructions supplied with the accessory for the installation.
For the setting parameters, see “9.2.2 Heat pump service menu" on page 59.
Tbt1 probe
(system water tank temperature probe)
Set par.15.4=1
Tw2 probe
(mixed water temperature probe sent to zone 2)
Set par.15.3=1
Summary of Contents for OMNIA S HYBRID C 3.2
Page 86: ... ...
Page 87: ... ...
Page 88: ...FERROLI S p A Via Ritonda 78 a 37047 San Bonifacio Verona ITALY www ferroli com Made in Italy ...