13
Pegasus F2
4.03 Exploded view of the control panel (fig. 6)
4.02 Access to the control panel internal components
For access to the terminal block and the internal components of the control panel, proceed as follows:
a - Shut off the power supply to the boiler.
b - Lift off the boiler cover (held in place by slot pins).
c - Unscrew the two screws that hold the plastic panel against the side of the boiler .
d - Rotate the panel all the way round to its locked position.
e - Carry out the work and reassemble in reverse order.
Caution: Handle the flame control electronic board (part 4 in fig. 6) and its connections with
particular care.
Key
1. Control panel
2. Wiring harness protection plate
3. Terminal block
4. Ignition PCB
5. Boiler control thermostat
6. Limit thermostat (manual reset)
7. Flue gas thermostat
8. Boiler on/off switch
9. Ignition lockout reset
10. Combined temperature and pressure gauge
Fig. 6
1
2
6
9
8
10
5
7
4
3
Summary of Contents for PEGASUS F2 102
Page 2: ...Pegasus F2 2...
Page 23: ...23 Pegasus F2...