48
SIS. ECOTECH 2 F
Code 3541B140 - 11/2011 (Rev. 00)
GB
1-
Open the triangles as shown in figure 1.
2c-
Clamp the lower joints (fig. 2c)
2a-
Secure the upper joint to the support
profiles
ATTENTION: RESPECT THE MEASURE-
MENTS GIVEN IN fig. 2a
2a
2
2a
2b
2c
2b-
Secure the lower joint (fig. 2b) to the base
profile.
2a
510
2b
2c