4. Commissioning
4-3
Festo P.BE-MPA-EN en 1108e
4.1
General instructions
4.1.1
Before commissioning
•
Switch off the power supply before connecting or
disconnecting plug connectors (otherwise functional
damage).
•
Only commission a valve terminal that has been mounted
and wired completely.
•
Make sure that there is a sufficient supply of fresh air
(cooling) for the following operating conditions:
– maximum number of valves
– maximum operating voltage
– When the solenoid coil is constantly under load
•
Please observe the following instructions on building up
pressure in the overall supply.
Commissioning of the CPX terminal is described in the
corresponding description for the CPX bus node
(see the system description of your CPX terminal,
table “Descriptions of the CPX terminal”).
Summary of Contents for 530411
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE MPA EN en 1108e ...
Page 16: ...Contents and general instructions XIV Festo P BE MPA EN en 1108e ...
Page 17: ...Summary of components 1 1 Festo P BE MPA EN en 1108e Chapter 1 Summary of components ...
Page 59: ...Fitting 2 1 Festo P BE MPA EN en 1108e Chapter 2 Fitting ...
Page 73: ...Installation 3 1 Festo P BE MPA EN en 1108e Chapter 3 Installation ...
Page 108: ...3 Installation 3 36 Festo P BE MPA EN en 1108e ...
Page 109: ...Commissioning 4 1 Festo P BE MPA EN en 1108e Chapter 4 Commissioning ...
Page 172: ...5 Maintenance and conversion 5 42 Festo P BE MPA EN en 1108e ...
Page 173: ...Technical appendix A 1 Festo P BE MPA EN en 1108e Appendix A Technical appendix ...
Page 209: ...Index C 1 Festo P BE MPA EN en 1108e Appendix C Index ...
Page 210: ...C Index C 2 Festo P BE MPA EN en 1108e Contents C Index C 1 ...