2.1 Preparing the CP system for operation
on the PROFIBUS-DP
2.1.1 Operating voltage
PLEASE NOTE
The CP fieldbus node must be supplied with opera-
ting voltage by a suitable power unit.
2.1.2 Saving the string assignment
PLEASE NOTE
Before commissioning the CP system, you must first
prepare the CP system for commissioning
(see "CP system" manual).
2. Commissioning
CP FB13-E 9904b
2-3
Summary of Contents for Compact Performance CP-FB9-E
Page 12: ...Chapter 1 Installation 1 Installation CP FB13 E 9904b 1 1 ...
Page 30: ...Chapter 2 Commissioning 2 Commissioning CP FB13 E 9904b 2 1 ...
Page 70: ...Chapter 3 Diagnosis 3 Diagnosis CP FB13 E 9904b 3 1 ...
Page 95: ...3 Diagnosis 3 26 CP FB13 E 9904b ...
Page 96: ...Appendix A Technical specifications A Technical specifications and index CP FB13 E 9904b A 1 ...