Before commissioning the CP system on the
PROFIBUS-DP, proceed as follows:
1. Connect the operating voltage for the node (see "CP
system" manual).
2. Connect the CP modules.
3. Switch on the operating voltage.
4. Save the string assignment by pressing the SAVE
button.
1
SAVE-Button: saves the configuration of the CP system as the
ACTUAL configuration
Fig. 2/1 SAVE button
1
2. Commissioning
2-4
CP FB13-E 9904b