Festo CPV..−GE−IP−8 0211NH English
14
2.2 Example of connection with PELV power unit and
potential equalization
1
PE and potential
equalization
2
Load voltage can
be switched off
separately and
external fuses
12
14
12
14
12
14
12
14
12
14
12
14
12
14
12
14
Us
Up
Run
Err
IP−L
24V
12
14
12
14
12
14
12
14
12
14
12
14
12
14
12
14
Us
Up
Run
Err
IP−L
24V
3 4 1 2
1
2
4 A
4 A
24 V
0 V
A connection example for operation of the CPV Direct with
electrical isolation of the operating and load voltages can
be found in the manual P.BE−CPV−DI−IP−.. .
2.3 Field bus connection
Connection to the field bus is made with a Beckhoff LWL−
IP67 plug. Details on fitting can be found in the manual
P.BE−CPV−DI−IP...