background image

5.

DIL switch 2

Description

1: ON
2: OFF

è

 8.2.2 Resetting web server SSL certificates to fac-

tory setting

1: ON
2: ON

è

 8.2.1 Reset gateway to factory setting

Tab. 5: DIL switch 2
Rotary switch for the operating mode

Switching position

Operating mode/function

0: Off

‘Cloud’ network connection is deactivated (interface switched

off).

No communication with the MQTT broker network and no com-

munication with field devices.

1: Onboarding reserved
2: Read only

Gateway sends process data of the configured field devices to

configured MQTT brokers.

Manual adding of field devices is enabled.

Automatic adding of field devices via the Auto-Scan function is

blocked.

Removal of field devices is blocked.

3: Read/Write

The gateway sends process data from the configured field

devices to the MQTT broker network.

Manual adding of field devices is enabled.

Automatic adding of field devices via the Auto-Scan function is

enabled.

Parameters of connected devices can be changed.

Tab. 6: Rotary switch for the operating mode

4.2.4

Network connections

There are 2 Industrial Ethernet interfaces on the gateway for connection to an
MQTT broker and for the Industrial Ethernet network with connection to field
devices. The ‘Cloud’ and ‘Device’ network connections. Both connections have
auto-negotiation and crossover detection.
The following table shows the pin allocation with deactivated Crossover detection:

Connection Pin

Cloud

Device

Signal

Explanation

Signal

Explanation

1

TD+

Transmitted data +

RD+

Received data +

2

RD+

Received data +

TD+

Transmitted data +

3

TD–

Transmitted data –

RD–

Received data –

4

RD–

Received data –

TD–

Transmitted data –

Shielding

1)

FE,
Shield

Functional earth

FE,
Shield

Functional earth

1) connected to functional earth via RC link

Tab. 7: Network connections

4.2.4.1 MQTT broker
The connection to an MQTT broker is established via the ‘Cloud’ network connec-
tion.
4.2.4.2 Fieldbus protocol and field devices
The ‘Device’ network connection can be used to connect field devices with an
Industrial Ethernet connection directly to the Gateway, e.g. bus nodes or control-
lers (controller, PLC) with protocols such as PROFINET, EtherNet/IP or OPC UA.
4.2.5

Connection technology

The M12 socket [6] (

è

 Fig. 1) can be used to connect a CPX terminal without

network connection, i.e. without Industrial Ethernet connection, directly to the
gateway.

Connection

Connecting hardware

Cover cap

‘Cloud’ network connection

NECU-M-S-D12G4-C2-ET plug

ISK-M12

‘Device’ network connection
Interface to the CPX terminal
without network connection

NEBC-M12G5-S-1.5-N-M12G5 con-
necting cable

Tab. 8: Connection technology

5

Assembly

WARNING

Risk of injury due to electric shock.
• For the electric power supply, use PELV circuits that guarantee a reliable electric

disconnection from the mains network.

• Observe IEC 60204-1/EN 60204-1.
• Connect all circuits for the operating and load voltage supply.

NOTICE

Material damage due to incorrect mounting.
Select screws that are suitable for the material of the interlinking block:
• Polymer: thread-grooving screws
• Metal: screws with metric thread

When ordering a single gateway, all the required screws are included.

The gateway is mounted in an interlinking block of the CPX terminal.

Version 1:
Gateway in an interlinking block with system supply, e.g. CPX-GE-EV-S-...

Version 2:
Gateway in an interlinking block without system supply between two end
plates with system supply, e.g. CPX-EPL-EV-S-...

1

2

3

2

2

2

Fig. 3: Mounting (version 1)

1 Gateway CPX-IOT
2 Screw

3 Interlinking block

(with system supply)

1. Check the seal and the seal surfaces.
2. Replace damaged seal.
3. Push the gateway carefully and without tilting into the interlinking block up to

the stop.

4. Screw the screws into the existing thread.

Tighten the screws in crosswise.

Tightening torque: 1 Nm ± 10% 

6

Installation

6.1

General information about installation

WARNING

Risk of injury due to electric shock.
• For the electric power supply, use PELV circuits that guarantee a reliable electric

disconnection from the mains network.

• Observe IEC 60204-1/EN 60204-1.
• Connect all circuits for the operating and load voltage supply.

NOTICE

Short circuit as a result of ingress of liquids or foreign matter.
Damage to the electronics or malfunction.
• Use connection hardware with the required degree of protection.
• Use cover caps to seal unused connections.
• Only operate the product with cover for DIL and rotary switches mounted.

The operating and load voltage supply is via an interlinking block with system
supply or via an end plate with system supply.
Information on power supply:

è

 System description of the CPX terminal (CPX-SYS)

è

 Pin allocation power supply connection (CPX-PIN-BEL)

Comply with the handling specifications for electro-statically sensitive devices.

NOTICE

Unauthorised Access to the Device Can Cause Damage or Malfunction.
• When connecting the device to a network, protect the network from unauthor-

ised access.
Standards for security in information technology can be used for network
protection measures, e.g. IEC 62443, ISO/IEC 27001.

7

Commissioning

7.1

Selecting operating mode of the gateway

A gateway operating mode must be selected to establish a connection to an MQTT
broker 

è

 Rotary switch for the operating mode.

The rotary switch must be set to [Read only] or [Read/Write] to establish a connec-
tion to the MQTT broker and to the field devices.
7.2

Parameterisation

The gateway is parameterised via the integrated web server of the gateway.

Summary of Contents for CPX-IOT

Page 1: ...liar with installation of electrical control systems 3 Additional information Contact the regional Festo contact if you have technical problems è www festo com Accessories and spare parts è www festo com catalogue 4 Product overview 4 1 Licence information This product uses open source software Licence Version GNU General Public License Version 2 GNU Lesser General Public License Version 2 1 Tab 2...

Page 2: ...f injury due to electric shock For the electric power supply use PELV circuits that guarantee a reliable electric disconnection from the mains network Observe IEC 60204 1 EN 60204 1 Connect all circuits for the operating and load voltage supply NOTICE Material damage due to incorrect mounting Select screws that are suitable for the material of the interlinking block Polymer thread grooving screws ...

Page 3: ...work status LED status Meaning Error handling green light Normal operating status The gateway is connected with field devices flashing green No connection to field devices The gateway has received an IP address but is not yet connected with field devices Check configuration Check module status Restart module Repeat Onboarding red light Communication with the field devices has failed non permitted ...

Page 4: ...ateway out of the interlinking block without tilting it 10 Technical data Property Specification value General technical data è System description of the CPX terminal CPX SYS Power supply Operating power supply UEL SEN V DC 24 25 Intrinsic current consumption at nominal operating voltage 24 V from operating voltage supply UEL SEN mA Typically 80 internal electronics Mains buffering time ms 10 Sepa...

Reviews: