DNCKE−...−S / KEC−...−S
Festo DNCKE−...−S / KEC−...−S 1002a English
42
Commissioning preparation (removing the transport protection mandrel,
only KEC−...−S)
1. Pressurise the supply port
2
with at
least 3.8 bar.
2. Open up the locking screw
3
with an
Allen key.
Type
DNCKE−
KEC−
40
16
63
20
100
25
Width across flats for
internal hexagon
socket
SW6
SW8
Fig.18
3. Unscrew the adjusting sleeve
5
half a
turn in an anti−clockwise direction.
4. Remove completely the transport protec
tion mandrel
9
.
Note
If the clamping rod is inserted tilted, it
may damage the scraper and the seals.
S
The clamping unit can be pushed on
without any problems if there is a 15°
chamfer at least 3 mm wide at the end
of the clamping rod (rod quality see
chapter Technical data").
5. Push the clamping unit carefully onto the rod of the plug−in product.
6. Adjust the KEC−... to the new clamping rod (see following chapter).
Fig.16
2
Fig.17
3
Fig.19
5
9
Fig.20
KEC−...