4. Commissioning
4−43
Festo P.BE−SBO−Q−EN en 0702a
Commissioning
Note
In order that the Compact Vision System is recognized in
the CP string when the power supply for the CP master is
switched on (e. g. of a CPX−CP interface), the Compact
Vision System must already be ready for operation.
·
Switch on the power supply for the Compact Vision
System at least 15 seconds before the power supply for
the CP master.
1. Make a connection to the device with the CheckKon
program and set the system parameter Function at
CANinterface" to Out".
Close the CheckKon program.
2. Switch the system off in order to avoid faults or damage.
Disconnect the power supply for the device and the CPX
terminal.
3. Connect the Compact Vision System to CP string 1 or 3.
4. Switch on the power supply for the device.
5. Make a connection to the device with the CheckKon
program and set the system parameter Function at
CANinterface" to CPI module".
6. Now connect the power supply for the CPX−CP terminal.
7. Press the Save button on the CPX−CP terminal in order to
save the new string allocation.
8. Restart the CPX−CP terminal. In order to do this, switch off
the power supply briefly for the CPX−CP terminal.
9. If any faults in the CPI module function are displayed on
the device, confirm with the fault quitting signal at input I1.
Summary of Contents for SBO Q Series
Page 2: ......
Page 8: ...Contents and general instructions VI Festo P BE SBO Q EN en 0702a ...
Page 19: ...System summary 1 1 Festo P BE SBO Q EN en 0702a Chapter 1 ...
Page 37: ...Fitting 2 1 Festo P BE SBO Q EN en 0702a Chapter 2 ...
Page 45: ...Installation 3 1 Festo P BE SBO Q EN en 0702a Chapter 3 ...
Page 60: ...3 Installation 3 16 Festo P BE SBO Q EN en 0702a ...
Page 61: ...Commissioning 4 1 Festo P BE SBO Q EN en 0702a Chapter 4 ...
Page 114: ...4 Commissioning 4 54 Festo P BE SBO Q EN en 0702a ...
Page 115: ...Diagnosis and error treatment 5 1 Festo P BE SBO Q EN en 0702a Chapter 5 ...
Page 122: ...5 Diagnosis and error treatment 5 8 Festo P BE SBO Q EN en 0702a ...
Page 123: ...Technical appendix A 1 Festo P BE SBO Q EN en 0702a Appendix A ...
Page 146: ...A Technical appendix A 24 Festo P BE SBO Q EN en 0702a ...
Page 147: ...Index B 1 Festo P BE SBO Q EN en 0702a Appendix B ...
Page 148: ...B Index B 2 Festo P BE SBO Q EN en 0702a Contents B Index B 1 B 1 Index B 3 ...
Page 156: ...B Index B 10 Festo P BE SBO Q EN en 0702a Z Zoom 1 14 ...