4. Commissioning
4−44
Festo P.BE−SBO−Q−EN en 0702a
A string allocation together with other modules could look
like this:
14
12
14
12
14
12
14
12
!!!
X1
X2
X4
X3
RUN
PS
PL
SF
M
STOP
ERR
TP
Fig.4/11: Example − string allocation: Compact Vision System
SBOI−Q−... as a CPI module
The Compact Vision System can be addressed by a higher−
order controller, which is either:
integrated in the CPX terminal (e. g. CPX−FEC−.. from
Version R5)
or
is connected to the higher−order fieldbus.
To do this, the associated CPX terminal must also be
connected to the same fieldbus (e. g. to PROFIBUS via the
CPX module CPX−FB13−..." from Version R12).
Additional information about CP and CPX can be found in the
CPI system description" (P.BE−CPX−CP−...).
Additional information about fieldbus nodes can be found in
the Electronics description" (P.BE−CPX−FB...−...).
Summary of Contents for SBO Q Series
Page 2: ......
Page 8: ...Contents and general instructions VI Festo P BE SBO Q EN en 0702a ...
Page 19: ...System summary 1 1 Festo P BE SBO Q EN en 0702a Chapter 1 ...
Page 37: ...Fitting 2 1 Festo P BE SBO Q EN en 0702a Chapter 2 ...
Page 45: ...Installation 3 1 Festo P BE SBO Q EN en 0702a Chapter 3 ...
Page 60: ...3 Installation 3 16 Festo P BE SBO Q EN en 0702a ...
Page 61: ...Commissioning 4 1 Festo P BE SBO Q EN en 0702a Chapter 4 ...
Page 114: ...4 Commissioning 4 54 Festo P BE SBO Q EN en 0702a ...
Page 115: ...Diagnosis and error treatment 5 1 Festo P BE SBO Q EN en 0702a Chapter 5 ...
Page 122: ...5 Diagnosis and error treatment 5 8 Festo P BE SBO Q EN en 0702a ...
Page 123: ...Technical appendix A 1 Festo P BE SBO Q EN en 0702a Appendix A ...
Page 146: ...A Technical appendix A 24 Festo P BE SBO Q EN en 0702a ...
Page 147: ...Index B 1 Festo P BE SBO Q EN en 0702a Appendix B ...
Page 148: ...B Index B 2 Festo P BE SBO Q EN en 0702a Contents B Index B 1 B 1 Index B 3 ...
Page 156: ...B Index B 10 Festo P BE SBO Q EN en 0702a Z Zoom 1 14 ...