4. Commissioning
4-19
Festo P.BE-SPC11-SYS-ASI-EN en 0203NH
Output bit O1 supplies a 1-signal. The drive is now ready for
operation.
When the teach procedure is concluded, the SPC11 knows
the locations of the mechanical end positions (P.01...P.02).
You can now teach manually the intermediate positions
(P.03...P.04) or trigger a positioning task to the end positions
(P.01...P.02).
Summary of Contents for Soft Stop SPC11 Series
Page 2: ......
Page 14: ...Contents and general instructions XII Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 15: ...Summary of components 1 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 1 ...
Page 25: ...Fitting 2 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 2 ...
Page 28: ...2 Fitting 2 4 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 29: ...Installation 3 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 3 ...
Page 61: ...Commissioning 4 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 4 ...
Page 100: ...4 Commissioning 4 40 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 101: ...Diagnosis and error treatment 5 1 Festo P BE SPC11 SYS ASI EN en 0203NH Chapter 5 ...
Page 114: ...5 Diagnosis and error treatment 5 14 Festo P BE SPC11 SYS ASI EN en 0203NH ...
Page 127: ...Technical appendix B 1 Festo P BE SPC11 SYS ASI EN en 0203NH Appendix B ...