Commissioning

CAUTION!

Risk of injury due to unexpected movement of components.

Protect the positioning range from unwanted intervention.

Keep foreign objects out of the positioning range.

Perform commissioning at low speed.

NOTICE!

Material damage due to incorrect or incomplete installation.

The following conditions must be fulfilled for commissioning:

The system must be fully assembled.

The electrical installation must be complete and checked.

The pneumatic installation must be complete and checked.

Prior to commissioning, a safety analysis must be carried out and all appropriate measures implemen-
ted. Commissioning is dependent on the customer-specific application.

During commissioning, observe the associated documentation for the individual components
installed 

è

 1.1 Applicable documents.

Web visualisation of the balancer controller CECC-D-BA enables commissioning via the web browser

è

 Ethernet interface [X8].

Power supply

When switching on the power supply, proceed as follows:
1. Switch on the power supply.
2. Switch on the compressed air supply.

10

Operation

Operation is dependent on the customer-specific application.

During operation, observe the associated documentation for the individual components installed

è

 1.1 Applicable documents.

Commissioning

17

Festo — YHBP-1 — 2018-11

Summary of Contents for YHBP-1

Page 1: ...8088702 YHBP 1 Balancer kit 8088702 2018 11 8088704 Instructions Assembly Installation...

Page 2: ...Translation of the original instructions 2 Festo YHBP 1 2018 11...

Page 3: ...4 Service 6 5 Product overview YHBP 7 5 1 Scope of delivery 7 5 2 Function 8 6 Transport 8 7 Assembly 9 8 Installation 10 8 1 Interfaces of valve unit VPCB T22 10 8 2 Pneumatic installation 11 8 3 In...

Page 4: ...Instruction manu al Control element VAOH P15 H13 Operation Instruction manu al Valve unit VPCB T22 Operation installation Instruction manu al Connector SET VABS P15 S B6 Assembly Description Controlle...

Page 5: ...ey Data Matrix Code of the product 2 Download documents from the Festo Support Portal by entering the order ID product key Data Matrix Code www festo com sp 3 Print out documents and keep together wit...

Page 6: ...d and the manufacturer is not liable for damages 2 3 Foreseeable misuse Never use the product as follows With unauthorised modifications or alterations to the product With load limits exceeded In an i...

Page 7: ...rol element VAOH 11 Tubing not in scope of delivery Fig 1 Product overview YHBP 5 1 Scope of delivery The kit only contains individual components that can be used for building a servo pneumatic balanc...

Page 8: ...escription of the operating modes can be found in the application notes 1 1 Applicable documents 6 Transport Sequence of transport and unpackaging NOTICE Damage to the product due to incorrect transpo...

Page 9: ...Applicable documents Attach the proximity sensor near the lower end position of the DNCI Tightening torque 0 6 Nm 3 Assemble the displacement encoder DNCI backlash free and parallel to the cylinder DS...

Page 10: ...r direct pressure measurement on cylinder DSBG 6 Status LED 7 Power Error LED 8 Earth connection Fig 2 VPCB interfaces 2 Connection 2 G3 8 for working air balancer cylin der 9 Connection G1 8 for pneu...

Page 11: ...ter 12 mm 2 Connect pressure gauge input connection 9 Bedienelement of valve unit VPCB with handle VAOH Tubing diameter 6 mm Tube length 0 5 m 10 m 3 Assemble the silencer not in scope of delivery as...

Page 12: ...O interfaces X2 X3 X4 X5 6 CAN interface X6 7 Power supply for the I O interfaces X5 Fig 4 Interfaces CECC D BA The status LEDs show the operating status of the CECC D BA Status LED Meaning Run Applic...

Page 13: ...mode X2 6 Reserved X2 7 Reserved X3 0 6 digital inputs System enable X3 1 X3 5 Can be configured by the user X4 0 8 digital outputs Operation enabled X4 1 Can be configured by the user X4 2 Shut off v...

Page 14: ...ava Script and support of HTML5 Canvas e g Firefox Chrome Internet Explorer Version 9 Screen resolution 1280 x 768 pixels 8 4 Electrical installation WARNING Risk of injury due to electric shock For t...

Page 15: ...4 WH CAN_H 1C 7 5 BU CAN_L 1C Manifold block BUS IN 2 24 V logic 2V 9 GND logic GND 3 2C Cable 2 wire 2C Manifold block BUS OUT 1 Colour code in accordance with IEC 60575 1983 01 Tab 5 Pin allocation...

Page 16: ...that serves as a reference sensor as follows SMT 8M A PS 24V OE CECC D BA Wire colour1 Function Connection BN 24 V DC supply 24 V load BK Switching output Digital input X2 3 BU GND 24 V GND 1 Colour c...

Page 17: ...sis must be carried out and all appropriate measures implemen ted Commissioning is dependent on the customer specific application During commissioning observe the associated documentation for the indi...

Page 18: ...unctions The display and elimination of malfunctions are dependent on the customer specific application During operation observe the associated documentation for the individual components installed 1...

Page 19: ...80 200 Travel speed m s 1 Operating voltage DC V 21 6 26 4 Duty cycle 100 Residual ripple 5 Operating pressure bar 4 8 Operating medium Compressed air to ISO 8573 1 2010 6 4 4 Lubricated operation no...

Page 20: ...ization is prohibited Offenders will be liable for damages All rights reserved in the event that a patent utility model or design patent is registered Copyright Festo AG Co KG 73734 Esslingen Ruiter S...

Reviews:

Related manuals for YHBP-1