Earthing
–
Connect the earth terminal of the mono-block valve unit VPCB using an earthing cable, self-tap-
ping screw and toothed disc (included in the scope of delivery) with low impedance to the earth
potential.
–
Connect the earth terminal of the sensor interface CASB-MT-D3-R7 with low impedance to the
earth potential.
9
Commissioning
CAUTION!
Risk of injury due to unexpected movement of components.
•
Protect the positioning range from unwanted intervention.
•
Keep foreign objects out of the positioning range.
•
Perform commissioning at low speed.
NOTICE!
Material damage due to incorrect or incomplete installation.
The following conditions must be fulfilled for commissioning:
•
The system must be fully assembled.
•
The electrical installation must be complete and checked.
•
The pneumatic installation must be complete and checked.
Prior to commissioning, a safety analysis must be carried out and all appropriate measures implemen-
ted. Commissioning is dependent on the customer-specific application.
–
During commissioning, observe the associated documentation for the individual components
installed
è
Web visualisation of the balancer controller CECC-D-BA enables commissioning via the web browser
è
Power supply
When switching on the power supply, proceed as follows:
1. Switch on the power supply.
2. Switch on the compressed air supply.
10
Operation
Operation is dependent on the customer-specific application.
–
During operation, observe the associated documentation for the individual components installed
è
Commissioning
19