8
Installation
8.1
Valve unit interfaces
Interfaces VPCB-...-T22
1 Port [1]
G3/8 compressed air
3 Port [3]
G3/8 exhaust air
4 Manual exhausting
5 Installation option for connection set VABS-P15-S-B6
for direct pressure measurement on cylinder DSBG
6 "Status" LED
7 “Power/Error” LED
8 Earth connection
Fig. 2 VPCB interfaces
2 Port [2]
G3/8 working air (balancer cylinder)
9 Port [H]
G1/8 pneumatic control element
10 Connection [X2]
CECC-D-BA (CAN interface)
11 Connection [X1]
DNCI displacement encoder
12 Shut-off valve 1
13 Shut-off valve 2
Fig. 3 VPCB interfaces
Installation
10
Festo — YHBP — 2020-09