MR25664
10
INSTALLATION & SET-UP
READ AND UNDERSTAND ALL SAFETY STATEMENTS
Read all safety decals and safety statements in all manuals before beginning any
Cold
Planer hydraulic connection. Know and obey all OSHA regulations, local laws, and
other professional guidelines for your operation. Know and follow good work practices
when assembling, maintaining, repairing, mounting, removing, or operating this
equipment.
1.
Relieve any pressure from the auxiliary hydraulic system. After making sure that there is not any
foreign matter on the hydraulic couplers connect the case drain coupler to the case drain on your
skid steer loader. NOTE: The case drain line must be connected first, then the power and return
hoses. When disconnecting the hoses, it is recommended to disconnect the case drain line last.
2.
Connect the power and return couplers to the high flow auxiliary hydraulic system of your skid
steer loader. Route the hose in such a fashion as to avoid pinching or chafing.
CAUTION!
BE SURE CASE DRAIN COUPLER IS COMPLETELY ENGAGED. Immediate
hydraulic motor seal failure and planetary damage will occur if case drain is not
successfully
connected.
3.
Carefully raise the loader and cycle the tilt cylinders to check hose clearances and to check for
any interference.
4.
Cycle the hydraulic cylinder(s) on this product several times from fully retracted to fully extended
until all air has been completely removed from the cylinder(s).
WARNING!
Do not lock the auxiliary hydraulics of your prime mover in the "ON" position.
Failure to obey this warning could result in death or serious injury.