14
OPERATION
STRAIGHT
Straight Position:
1. If starting from the scoop position, reverse
flow until right blade completely retracts.
2. While still reversing flow, retract left blade
until it is in the straight position.
3. Use normal flow to extend right blade until
it is parallel to left blade.
V Position:
Reverse flow until both blades retract and
stop.
Right Angle Position:
If starting from the Scoop position, reverse
flow until right blade retracts and stops.
V
RIGHT ANGLE
Summary of Contents for V-Snow Blade
Page 2: ...2 Notes...
Page 17: ...17 OPERATION figure 2 figure 3 Level Scoop Position Shown...
Page 24: ...24 MAINTENANCE RECORD Date Maintenance Procedure Performed Performed by Comments...
Page 34: ...34 HYDRAULIC ELECTRIC MANIFOLD SCHEMATIC...
Page 35: ...35 HYDRAULIC MANIFOLD SCHEMATIC...
Page 36: ...36 MOLDBOARD ASSEMBLY...
Page 41: ...41 NOTES...