3 Product Installation
11
3 Product Installation
3.1 Preparation
When unpacking the AN5506-04-B, please check that all items on
the parts list are present and not damaged. If any item is missing or
has been damaged, please contact local agencies of FiberHome
immediately.
Before installing the AN5506-04-B, please read the following
thoroughly.
The installation location must be free of excessive moisture
and must be properly grounded for lightning protection.
The selected installation position enables the connection
between the AN5506-04-B and the outside. For example, there
should be sufficient outlet space for power cables and network
cables.
The installation position guarantees adequate air flow to
facilitate heat dissipation.
The installation position provides good earth grounding
conditions.
3.2 Equipment Mounting
The AN5506-04-B can be either secured on a stable plane like an
office desk, or hung vertically against the wall. The two mounting
methods are introduced below: