Summary of Contents for AN6000-15

Page 1: ...AN6000 15 Optical Line Terminal Equipment Quick Installation Guide FiberHome Telecommunication Technologies Co Ltd Version A Code MN000004295 ...

Page 2: ...lecommunication Technologies Co Ltd Address No 67 Guanggu Chuangye Jie Wuhan Hubei China Zip code 430073 Tel 6 03 7960 0860 0884 for Malaysia 91 98 9985 5448 for South Asia 593 4 501 4529 for South America Fax 86 27 8717 8521 Website http www fiberhomegroup com No part of this document including the electronic version may be reproduced or transmitted in any form or by any means without prior writt...

Page 3: ...les Checking before power on Power on test Installing cabinet doors 2 Safety precautions Installation tools Start Installation preparations Installing cabinets Installing subracks Installing cards and components Operation procedure Reference information Subrack overview Installing and securing subracks Equipment layout Installing cards Installing a fan unit Operation rules for plugging unplugging ...

Page 4: ...nged in good order and the extra parts of ties are cut from the root without leaving sharp points Binding Cables Caution Prior to equipment installation inspect the equipment room cabinets power supplies cables especially earth ground cables and supporting facilities After confirming that the conditions for installation are satisfactory start the work following project design documents Inspection ...

Page 5: ...ric drill including the drill bits Marker pen Insulating tape Long tape Knife Spirit level Claw hammer insulated Cable tie Fiber binding strap Insulating gloves Hydraulic pliers Flat screwdriver insulated Open corrugated pipe Crimping pliers Multimeter Optical power meter Combination wrench insulated M6 to M12 socket wrench insulated Torque wrench insulated Fiber puller Flexible conduit ...

Page 6: ...e 1 486 mm 480 mm 254 2 mm Subrack with mounting ears for a 21 inch cabinet 486 mm 530 mm 254 2 mm Note 1 The AN6000 15 subrack is equipped with mounting ears for a 19 inch cabinet by default 5 Installing Subracks 5 1 Subrack Overview Subrack Dimensions Subrack Structure Cabinet Model Manual 19 inch 600 mm deep cabinets 4102596 to 4102599 Quick Installation Guide for the 19 inch Cabinet 600 mm dee...

Page 7: ...or 21 inch cabinet The distance between every three mounting holes on the front vertical mounting flange in a 19 inch cabinet is 1 U 44 45 mm The distance between every two mounting holes on the front vertical mounting flange in a 21 inch cabinet is 1 SU 25 mm Rules for Arranging Subracks Example of Arranging Subracks in a 19 inch Cabinet 5 2 Equipment Layout 6 Unit U 1U 44 45 mm Example of Arrang...

Page 8: ...ns for mounting the subrack and fiber passage unit on the vertical mounting flanges of the cabinet Then install floating nuts Push the subrack into the cabinet along the slide rails Installing Components Correct Way to Install a Screw Pre tighten the screw Tighten the screw with moderate force making sure that the screwdriver is on the same line with the screw Make sure that the screw is engaged w...

Page 9: ... subrack and the fiber passage unit on the vertical mounting flanges of the cabinet Then install floating nuts Push the subrack into the cabinet along the slide rails Installing Components Adapter Mounting Ears Install the adapter mounting ears 3 Refer to Installing Subracks in a 19 inch Cabinet Correct Way to Install a Screw 4 5 When installing the adapter mounting ears install the panel screws b...

Page 10: ... panels When you unplug a dummy panel make sure that you plug it back in five minutes Use care when plugging a card The card cannot be inserted if not properly oriented Cards are valuable and fragile Please treat them with great care Prevent the circuit surfaces of cards from contacting each other to avoid shorting or scratching If the unpacked card is a spare one it will not be installed immediat...

Page 11: ... cage 10 Grab the handle of an optical module with the hooked end of a fiber puller and draw it out to detach the optical module from the EMI cage Pulling an optical module Pulling an optical fiber hooked end ESD protection gloves wrist strap Fiber puller Caution Fiber puller ESD protection gloves wrist strap 1 1 While pulling an optical module hold the fiber puller tightly so that the module will...

Page 12: ...ot in a correct direction Do not force in the card The core switch card power card and CIOA card have color marks on both ends Apply the cards to the slots with the same color marks to prevent mismatch Insert dummy panels to the slots not holding cards The procedures for installing dummy panels are the same as those for installing common cards Cross screwdriver M3 Captive screw ESD protection glov...

Page 13: ...he top access wiring mode or the floor access wiring mode according to the equipment room and the installation site conditions This guide uses the top access wiring mode as an example The AN6000 15 uses the PDP850A 3000064 For a cabinet equipped with mouseproof hop pockets on the top fasten the mouseproof hop pockets after external wires and cables are led into the cabinet and well arranged For a ...

Page 14: ...13 10 Cabinet with Routed Fibers and Cables A Subrack for PON Services 13 ...

Page 15: ...not connect the cabinet power cables when the power supply is connected Make sure the DC power input is cut off during cable connection and attach labels to the switches to be used Never expose the joining part of a power cable or a power connector unless necessary If the bonding resistance between the equipment ground cable and the earth ground bar is higher than 0 1 ohm the ground cable should b...

Page 16: ...es to the PDP and the external power supply respectively The terminals on the PDP from left to right are 48V_A 0V_A 0V_B PE and 48V_B respectively 4 M3 To the external 48 V DC power Processing External Power Cables Cut Wrap Crimp Insulate Wrap the bare end of the cable with an insulating tape to prevent short circuit during cable layout 2 1 Measure a power cable and cut an appropriate length of it...

Page 17: ...ss the insulation covering of cord end terminals which may cause poor electrical connection Make sure the side with a larger area of a cord end terminal contacts the terminal block After connecting power cables attach a label indicating the cable information to both ends of each cable 1 cm to 2 cm away from the connector on each end Caution Power input interface Connect the cord end terminals 0 V ...

Page 18: ...erface of the CIOA card Connected to one of the terminals XS1 to XS4 on the PDP850A 3000064 to output the subrack alarms to the PDP 1PPS TOD interface of the CIOA card Connected to an external clock device Note 1 DC1 7 interface of the CIOA card Connected to a dry contact device Note 1 Note 1 The cable is connected by bare wires on this side Connection Network cable Connected to the Opposite End E...

Page 19: ...the cable bunch is between 10 mm and 30 mm the distance between cable ties should be 200 mm When the diameter of the cable bunch is equal to or larger than 30 mm the distance between cable ties should be 300 mm When binding bent cables do not bind them midway through the bend otherwise the cable cores may be broken The bending radius of cables R shall meet the following requirements D refers to th...

Page 20: ...ications and appearances of the commonly used LC PC and SC PC optical fiber connectors When the equipment is mounted in a 300 mm deep cabinet it is advisable to use short optical fiber connectors Type Short Optical Fiber Connector Long Optical Fiber Connector LC PC 31 mm 48 mm SC PC 39 mm 55 mm Open corrugated pipes should not be overloaded with optical fibers An open corrugated pipe with a diamet...

Page 21: ...0 to 17 along the front vertical mounting flange on the right side of the cabinet 2 1 2 1 Connector Subrack Side Opposite Side SC PC connector Ports 1 to 8 of the EX8A GX8A GM8A card Connected to an ODF to provide GPON 10G EPON XG PON GPON XG PON Combo GPON XGS PON Combo downlink channels Ports 1 to 16 of the GPOA EXOA GMOA GNOA card LC PC connector SFP ports 1 to 4 of the HSCA card Connected to a...

Page 22: ...er binding straps Tidy up optical fibers before binding them Bind optical fibers with fiber binding straps with appropriate tightness Avoid crossing or twisting optical fibers whenever possible 13 3 Arrangement After Layout 1 2 4 3 After the connection of optical fibers is completed installers should bind the optical fibers between the cabinet entrance and the fiber passage area with dedicated fib...

Page 23: ...equipment installers should 1 Confirm that the cabinet power cables are correctly connected with the external power supply equipment 2 Confirm that all the wires and cables are connected correctly 3 Place all the power switches on the PDP in the OFF position 4 Disconnect all the cards inside the subrack but leave them on their slots 5 Disconnect the fan unit inside the subrack but leave it on its ...

Page 24: ...d optical fiber Put an anti dust cap on an unused optical module Do not bind optical fibers with cable ties Use the black fiber binding strap instead Tidy up big bundles of cables and avoid crossing or twisting them whenever possible When plugging unplugging a card exercise care and align the card with slide rails Power cables should be separated from signal cables Keep cabinet doors closed in dai...

Reviews: