3 Installation
MY Series (10kVA-40kVA) UPS
User Manual
28
Step 3
Unpack the external package, and take out the fittings.
Step 4
Check the UPS.
Inspect the appearance and check if there has any damage caused by transportation. If damaged,
please inform the carrier immediately.
Compare with the packing list and check if the fittings are complete and proper. If the fittings
lack or model wrong, please take note and contact the local agency of our company.
Step 5
Put the front plate down to become an oblique board.
Step 6
After checking, unscrew the bolts that connected with the UPS and wooden bracket and the
supporting plate by socket wrench, the bolt position as shown in Figure3-4, remove the supporting
plate. Heighten the supporting feet (just for 30/30S/40/40S), as shown in Figure3-5. Then slip the
UPS along the oblique board to ground slowly..
Figure3-4
Bolts position of 10
The bolts position of MY series (10kVA-40kVA) is the same, above we take 10 as an example to
illustrate.
Figure3-5
Screw up the supporting feet brackets of 30/30S/40/40S