Read the installation instructions carefully and completely 

before proceeding with the installation.

 

I

TEMS INCLUDED

Barometric Draft Control 

W

HEN SHIPPED WITH A COLLAR ADDITIONAL ITEMS

Mounting straps, Collar, Mounting Hardware 

GENERAL INFORMATION 

B

AROMETRIC 

D

RAFT 

C

ONTROLS 

W

ITH OR 

W

ITHOUT 

C

OLLAR

 

The Field RC is furnished as standard 
equipment on many leading brands of oil 
fired heating equipment. It is calibrated 
to allow for easy adjustment to the 
furnace or boiler manufactures 
specifications. Designed for draft settings 
from .02” to .08” inches of W.C. 

CONTROL LOCATIONS 

The control should be located as close 
as possible to a furnace or boiler and 
positioned as shown in Figure 1.  It 
should be 18” from a stack switch and at 
least 18” from a combustible ceiling or 
wall.  Do not locate in a room separated 
from the appliance. 

NOTE: 

When a 

sheet metal tee is used instead of the 
collar, the “B” dimension must not be 
less than indicated for proper operation. 
(See Figure 2 and Table 1) 

COLLAR INSTALLATION 

W

HEN 

S

HIPPED 

W

ITH 

A C

OLLAR

 

To attach the collar to the flue, see Figure 2 and follow the 
instructions as follows: 

1. 

Bend the two ears at the front corners of the collar outward.  Bend 
90°, ¼” behind the single hole on the straps. 

2.  Insert clamping screw in ears on collar and bolt the remainder of 

the collar together. 

3. 

Hold the collar against the side of the flue in the exact position it is to 
be installed (shown by dotted lines) and mark the outline of the collar 
on the flue. 

4.  Cut a hole in the flue about ½” inside of the outline. 

5.  Make a series of cuts about ½” apart from the edge of this hole to 

the outline marks. 

6.  Strap the collar to the flue pipe. 

7.  Bend the tabs formed by the series of cuts outward against the inside of the collar to make a tight joint. 

8.  Insert the draft control.  (See Installation & Adjustment) 

If flue pipe is made of material too heavy to bend out into collar, make the diameter of the opening within ½” of the inside diameter of 
the collar. Seal with high temperature RTV silicone or high temperature foil tape UL listed for the temperature of the application. 

For proper settings and operation of the burner and the draft combustion testing instrumentation and draft gauges must be used. 

 

 

 