INSTALLATION AND ADJUSTMENTS 

1.  Apply mounting template onto the side of the return air plenum of the 

furnace. By wetting the back side and applying to any vertical surface of 
the return air plenum. 

CAUTION:

 

Unit must be mounted on a vertical surface. Level the template 

horizontally by marking a line onto the plenum using a level. Then applying the 
edge of the template on this line. (See Figure 1)

 

2.  After allowing template to dry, drill (4) 1/8 inch diameter holes at the 

location indicated on the template. Also, drill 4 or 5 holes along the cutting 
line of the 6 1/8 inch diameter hole indicated on the template to allow for a 
starting hole for cutting. Then cut hole with metal shears. 

3.  Mount the metering air damper using supplied sheet metal screw. (See 

Figure 2) 

I

NSTALLATION 

O

I

NTAKE 

H

OOD

 

1.  Locate intake hood at least 10 feet away from any device that 

exhaust flue gases. 

2.  Install the intake hood at least 12 inches above grade. 

3.  Cut a 6 1/8 inch diameter hole through the wall. Then mount the 

intake hood to the wall using suitable fastener. Then seal along the 
mounting plate with silicone or equivalent sealant. 

4.  Connect 6" flex duct or standard 6" duct piping from the intake hood 

to the metering air damper. Fasten and support  piping, so no 
straining of the metering air damper exist. (See Figure 3) 

NOTE:

 

Some areas require insulation wrapped around the duct. This will be 

required if sweating occurs on the outside of the duct. Seal all duct joints and 
seams with duct tape or equivalent.

 

A

DJUSTING 

M

ETERING 

A

IR 

D

AMPER

 

1.  Determine building square footage. Then refer to the table on the next 

page for recommended weighing of air damper. 

2.  Attach weights to the pendent on weight lever assembly using the supplied 

#5 screw and nut. (See Figure 4) 

Figure 3

Figure 1

Figure 2

Figure 4

Summary of Contents for 46233500

Page 1: ...le 6 duct or standard duct pipe not included to our metering air device mounted on the return supply air plenum This device effectively meters the air inflow for proper air circulation combustion and balance ITEMS INCLUDED 1 Metering air damper 1 Mounting template 1 6 intake hood 20 Small washers 2 grams each 3 Large washers 50 grams each English Page 1 Français Page 3 Espanõl Page 4 ...

Page 2: ...HOOD 1 Locate intake hood at least 10 feet away from any device that exhaust flue gases 2 Install the intake hood at least 12 inches above grade 3 Cut a 6 1 8 inch diameter hole through the wall Then mount the intake hood to the wall using suitable fastener Then seal along the mounting plate with silicone or equivalent sealant 4 Connect 6 flex duct or standard 6 duct piping from the intake hood to...

Page 3: ...square feet x average ceiling height 2 Estimate desired building air change per hour ACPH Typical ACPH for buildings Tight construction 35 to 5 Average construction 5 to 75 Loose construction 75 to 1 00 3 Calculate required CFM of make up air Building volume x ACPH 60 4 Measure return air plenum pressure In inches of water column pressure 5 Refer to chart or see example EXAMPLE 2 000 sq ft buildin...

Page 4: ...ttant des gaz d évacuation 2 Installer la hotte d admission à une élévation d au moins 12 po 3 Découper un trou de 6 1 8 po de diamètre dans le mur Fixer ensuite la hotte d admission au mur au moyen d une fixation adéquate Sceller ensuite le long de la plaque de montage avec un scellant de silicone ou l équivalent 4 Placer un conduit flexible 6 po ou un tuyau standard 6 po entre la hotte d admissi...

Page 5: ... de plafond moyenne 2 Évaluer le changement d air par heure CAPH désiré pour le bâtiment CAPH type pour les bâtiments Bâtiment hermétique 0 35 à 0 5 Bâtiment moyen 0 5 à 0 75 Bâtiment aléatoire 0 75 à 1 00 3 Calculer l air d appoint en pi3 min requis volume du bâtiment x CAPH 60 4 Mesurer la pression au plenum de retour d air pression en pouces à la colonne d eau 5 Se reporter au tableau ou voir l...

Page 6: ...2 INSTALACIÓN DE LA CAMPANA DE ADMISIÓN 1 Ubique la campana de admisión por lo menos a 10 pies de distancia desde cualquier dispositivo que deje escapar los gases de combustión 2 Instale la campana de admisión por menos a 12 pulgadas por encima del nivel del suelo 3 Corte un orificio de 6 1 8 pulgadas de diámetro a través de la pared Luego coloque la campana de admisión sobre la pared usando un su...

Page 7: ... edificio x altura promedio del techo 2 Estime el cambio de aire deseado del edificio por hora CAPH ACPH típico para los edificios Construcción apretada 35 al 5 Construcción media 5 al 75 Construcción floja 75 a 1 00 3 Calcule requirió CFM de hacen para arriba el aire volumen x ACPH del edificio 60 4 Presión de vuelta del pleno del aire de la medida En pulgadas de presión de la columna del agua 5 ...

Page 8: ...Page 8 P N 46233500 Rev A 11 00 ...

Reviews: