background image

7

Select the Desired Field Protocol 

– for ProtoNode RER (FPC-N34)

Using S0 – S3 bank of DIP Switches 

•  The S bank of DIP switches, S0 – S3 are used to 

select  the  BACnet  MS/TP,  BACnet/IP,  Modbus 

TCP,  or  Metasys  N2  on  the  ProtoNode  RER 

(FPC-N34-0636).

•  The  S  bank  of  DIP  switches  on  ProtoNode  LER 

(FPC-N35-0637 - LonWorks) is disabled.

S Bank DIP Switches

Figure 2.  S0 through S3 DIP Switches

BACnet MS/TP, BACnet/IP, Modbus 

TCP, and Metasys N2 Settings 

for ProtoNode RER (FPC-N34) 

Installation Steps for the Customer

The  following  chart  describes  S0  -  S3  DIP  switch 

configuration settings for the Raypak products to support 

BACnet MS/TP or BACnet/IP on a ProtoNode RER (Part 

# FPC-N34-0636). 
•  When  the  S  bank  of  switches  are  all  off  (default 

setting) BACnet IP is enabled.

ProtoNode RER

FPC-N34-0636

ProtoNode S 

Bank DIP Switches

Profile

SO S1 S2 S3

BACnet IP

Off Off Off Off

BACnet MS/TP 

On Off Off Off

Modbus TCP

Off On Off Off

Metasys 

On On Off Off

Table C.  “S” Bank DIP Switch Settings

Setting the Device Instance (Node-

ID) for BACnet MS/TP and BACnet/

IP on ProtoNode RER (FPC-N34)

•  BACnet IP/BACnet MSTP addressing: The BACnet 

device  instances  will  be  set  by  taking  the  BN_

Node_Offset  found  in  the  Web  Configurator  (See 

page  13)  and  added  to  each  Modbus  RTU  device 

address set on the Raypak VERSA IC Master units, 

attached to the ProtoNode. 
•  50000 is the default.
•  If  one  of  the  Raypak  VERSA  IC  Master  units 

Modbus RTU node addresses were set for 10, 

then the device instance would be 50010.

•  If the 2nd Device is Modbus address set 2, then 

the device instance will be set to 50002.

•  To  change  the  BN_Node_Offset  (See  page 

15).  The  node  offset  can  be  changed  from 

50000  to  some  other  number  via  the  Web 

Configurator. 

Setting the Node-ID for Metasys 

N2 and Modbus TCP on 

ProtoNode RER (FPC-N34)

•  Metasys N2 and Modbus TCP Node-ID Addressing: 

Metasys N2 and Modbus TCP Node-ID’s range from 

1-127. The Metasys N2 and Modbus TCP Node-ID 

will automatically set to the same value as the Node-

ID (Address) of the Raypak VERSA IC Master units. 

Do not use ID values over 127.

APPROVED 

UNCONTROLLED DOCUMENT IF PRINTED 

 

Summary of Contents for FPC-N34: FPC-N35

Page 1: ...TRUCTIONS ProtoNode RER and ProtoNode LER For Interfacing Raypak heating products equipped with the VERSA IC control platform to Building Automation Systems BACnet MS TP BACnet IP Modbus TCP Metasys N2 and LonWorks FPC N34 B 85 FPC N35 B 86 APPROVED UNCONTROLLED DOCUMENT IF PRINTED ...

Page 2: ... of page 4 Figures 1 6 7 9 revised Text revised following Figure 8 Section 4 verbiage and figures revised Figures 14 15 16 19 24 revised Instructions to Upload XIF section revised Appendix A Troubleshooting section revised Appendix B table Point Name descriptions updated APPROVED UNCONTROLLED DOCUMENT IF PRINTED ...

Page 3: ...e ProtoNode RER FPC N34 BACnet or ProtoNode LER FPC N35 LonWorks 12 4 CONNECT TO THE PROTONODE S WEB CONFIGURATOR TO SETUP THE RAYPAK PRODUCTS PROFILES CONNECTED TO THE PROTONODE RER OR LER 12 Connect the PC to the ProtoNode via the Ethernet port 12 Configure Profiles in the ProtoNode s Web Configurator 13 Selecting the Raypak profiles that will be connected the ProtoNode 13 Changing BN_Node_Offse...

Page 4: ...l Raypak products using VERSAIC control platform support ProtoNode Through the ProtoNode Web GUI Configurator the user selects how many VERSA IC Master units are connected to the ProtoNode as well as sets the Modbus Node ID for each VERSA IC Master A Versa IC Master Unit can have up to 169 Modbus points for up to 4 connected Versa IC equipped units Once the Raypak products are selected the ProtoNo...

Page 5: ...orts Figure 1 ProtoNode BACnet RER BACnet and ProtoNode LER LonWorks RER Configuration B 85 BACnet Modbus Metasys To Controller To Controller LER Configuration B 86 LonWorks 2 INTERFACING THE PROTONODE TO RAYPAK PRODUCTS APPROVED UNCONTROLLED DOCUMENT IF PRINTED ...

Page 6: ...figuration for the specific application See Selecting the Raypak profiles that will be connected the ProtoNode on page 13 12 Where the Field protocol is BACnet IP or Modbus TCP run the ProtoNode web GUI utility program to change the IP address No changes to the configuration file are necessary See Set IPAddress for BACnet IP via GUI on page 15 13 Commission the ProtoNode on the LonWorks Network Th...

Page 7: ... S Bank DIP Switch Settings Setting the Device Instance Node ID for BACnet MS TP and BACnet IP on ProtoNode RER FPC N34 BACnet IP BACnet MSTP addressing The BACnet device instances will be set by taking the BN_ Node_Offset found in the Web Configurator See page 13 and added to each Modbus RTU device address set on the Raypak VERSA IC Master units attached to the ProtoNode 50000 is the default If o...

Page 8: ...sure that power to the board is OFF Set Field RS 485 Baud Rate for BACnet MS TP on ProtoNode RER FPC N34 The serial baud rate setting between the BMS and the Protonode has no impact on the communication baud rate between the Versa IC Master and the Protonode The serial baud rate and Versa IC baud rate are not required to match for communication to take place The Versa IC Master baud rate must alwa...

Page 9: ...nnector Connect VERSA IC Modbus pin B RS485 to the ProtoNode s pin 2 RS485 on the Phoenix 6 pin connector Connect VERSA IC Modbus pin GND Ground and the ProtoNode s pin 3 Signal Ground on the Phoenix 6 pin connector Figure 6 VERSA IC Modbus RS485 pin outs to the ProtoNode s Modbus port Raypak Pin ProtoNode Pin Assignment MODBUS A Pin 1 RS 485 MODBUS B Pin 2 RS 485 MODBUS GND Pin 3 RS 485 GND Power...

Page 10: ...ypak VERSA Master Unit 1 Master Unit 2 Raypak VERSA Tx Rx Tx Rx Figure 7 Multiple VERSA IC Masters NOTE Multiple Master configuration requires each Master to have different ID s APPROVED UNCONTROLLED DOCUMENT IF PRINTED ...

Page 11: ... setting from the factory is OFF switch position right side To enable the EOL termination turn the EOL switch ON switch position left side Figure 9 End of line termination on from ProtoNode to RS 485 Field Protocol BACnet MS TP Figure 10 LonWorks Terminal Wiring the ProtoNode LER FPC N35 Field Port to a LonWorks network Connect the ProtoNode to the field network with the LonWorks terminal using a ...

Page 12: ...e PC and ProtoNode The default IP Address for the ProtoNode is 192 168 1 24 Subnet Mask is 255 255 255 0 If the PC and ProtoNode are on different IP networks assign a static IP Address to the PC on the 192 168 1 xxx network For Windows 10 Find the search field in the local computer s taskbar usually to the right of the windows icon and type in Control Panel Power to the ProtoNode ProtoNode Pin Pin...

Page 13: ... will list all the profiles available to select from To add an active profile to the ProtoNode select Add under Active Profiles For every Raypak VERSA IC Master Unit that will be added to the ProtoNode you will need to add the Active Profile on the left of the screen and the Modbus Node Address that the device is assigned to Each Versa IC Master unit must have a unique Modbus Node Address selected...

Page 14: ...nfigurator showing a profile selected Figure 16 Web Configurator showing a completed profile added Continue this process until all the Raypak VERSA IC Master units have been added APPROVED UNCONTROLLED DOCUMENT IF PRINTED ...

Page 15: ...iagnostics and Debugging button at the bottom right corner of the page to go to FSGUI utility Figure 17 Web Configurator showing multiple completed profiles added Click on setup and then Network Settings to enter the Edit IP Address Settings menu Figure 18 ProtoNode Network Settings Tab Type in a new Subnet Mask If necessary change the IP Gateway Default Gateway field Type in a new IP Gateway Note...

Page 16: ...rks assign a static IP Address to the PC on the 192 168 1 xxx network For Windows 10 Find the search field in the local computer s taskbar usually to the right of the windows icon and type in Control Panel Click Control Panel click Network and Internet and then click Network and Sharing Center Click Change adapter settings on the left side of the window Right click on Local Area Connection and sel...

Page 17: ...To request a 2 week complementary BACnet CAS key go to http app chipkin com activation twoweek and fill in all the information Enter Vendor Code Raypak2012 Once completed the key will be sent to the email address that was submitted From this email from Chipkin Automation the long key will need to be copied and pasted into the CAS key activation page Go to Chipkin Automation s web site download and...

Page 18: ...re is a COM issue To fix this check the following o Visual observations of LEDs on ProtoNode Section 8 o Check baud rate parity data bits stop bits o Check device address o Verify wiring o Verify the device was listed in the Web Configurator Section 6 Field COM problems o Visual observations of LEDs on the ProtoNode o Verify IP Address setting o Verify wiring NOTE If the problem persists a Diagnos...

Page 19: ...re will accelerate diagnosis of the problem Ensure that FieldServer Toolbox is loaded onto the local PC Otherwise download the FieldServer Toolbox zip via the MSA Safety website Extract the executable file and complete the installation Figure 24 Ethernet Port Location Connect a standard Cat 5 Ethernet cable between the PC and ProtoNode Double click on the FS Toolbox Utility Step 1 Take a Log Click...

Page 20: ...wer indicating normal operation ERR The SYS ERR LED will go on solid 15 seconds after power up It will turn off after 5 seconds A steady red light will indicate there is a system error on the ProtoNode If this occurs immediately report the related system error shown in the error screen of the GUI interface to FieldServer Technologies for evaluation RX The RX LED will flash when a message is receiv...

Page 21: ...X SNVT_count_f Boiler1 Error History 1 AI 31 AI 31 nvoLdErHt1_XXX SNVT_count_f Boiler1 Error History 2 AI 32 AI 32 nvoLdErHt2_XXX SNVT_count_f Boiler1 Error History 3 AI 33 AI 33 nvoLdErHt3_XXX SNVT_count_f Boiler1 Error History 4 AI 34 AI 34 nvoLdErHt4_XXX SNVT_count_f Boiler1 Error History 5 AI 35 AI 35 nvoLdErHt5_XXX SNVT_count_f Boiler1 Error History 6 AI 36 AI 36 nvoLdErHt6_XXX SNVT_count_f B...

Page 22: ...y 1 AI 89 AI 89 nvoFl2ErHt1_XXX SNVT_count_f Boiler3 Error History 2 AI 90 AI 90 nvoFl2ErHt2_XXX SNVT_count_f Boiler3 Error History 3 AI 91 AI 91 nvoFl2ErHt3_XXX SNVT_count_f Boiler3 Error History 4 AI 92 AI 92 nvoFl2ErHt4_XXX SNVT_count_f Boiler3 Error History 5 AI 93 AI 93 nvoFl2ErHt5_XXX SNVT_count_f Boiler3 Error History 6 AI 94 AI 94 nvoFl2ErHt6_XXX SNVT_count_f Boiler3 Error History 7 AI 95 ...

Page 23: ...viDHWDiff_XXX SNVT_temp_p DHW Priority BV 144 DO 144 nviDHWPrio_XXX SNVT_switch DHW During UnOcc BV 145 DO 145 nviDHWUnOc_XXX SNVT_switch WWSD During Occ AV 146 AO 146 nviWWSDOcc_XXX SNVT_temp_p WWSD During UnOcc AV 147 AO 147 nviWWSDUnOc_XXX SNVT_temp_p Tank Setpoint AV 148 AO 148 nviTnkSP_XXX SNVT_temp_p Tank Differential AV 149 AO 149 nviTnkDiff_XXX SNVT_temp_p Tank During UnOcc BV 150 DO 150 n...

Page 24: ...f On Off Off 36 Off Off On Off Off On Off On 37 Off Off On Off Off On On Off 38 A7 A6 A5 A4 A3 A2 A1 A0 Address Off Off On Off Off On On On 39 Off Off On Off On Off Off Off 40 Off Off On Off On Off Off On 41 Off Off On Off On Off On Off 42 Off Off On Off On Off On On 43 Off Off On Off On On Off Off 44 Off Off On Off On On Off On 45 Off Off On Off On On On Off 46 Off Off On Off On On On On 47 Off O...

Page 25: ... 101 Off On On Off Off On On Off 102 Off On On Off Off On On On 103 Off On On Off On Off Off Off 104 Off On On Off On Off Off On 105 Off On On Off On Off On Off 106 Off On On Off On Off On On 107 Off On On Off On On Off Off 108 Off On On Off On On Off On 109 Off On On Off On On On Off 110 Off On On Off On On On On 111 Off On On On Off Off Off Off 112 Off On On On Off Off Off On 113 Off On On On Of...

Page 26: ...evice must not be connected to a LAN segment with outdoor wiring Specification ProtoNode RER ProtoNode LER Electrical Connections One 6 pin Phoenix connector one RS 485 ground port power frame ground port One 3 pin RS 485 Phoenix connector one RS 485 ground port One Ethernet 10 100 Ethernet port One 6 pin Phoenix connector one RS 485 ground port power frame ground port One Ethernet 10 100 BaseT po...

Page 27: ...ave been removed or altered This Limited Warranty also will not apply to interconnecting cables or wires consumables or to any damage resulting from battery leakage In all cases FieldServer Technology s responsibility and liability under this warranty shall be limited to the cost of the equipment The purchaser must obtain shipping instructions for the prepaid return of any item under this warranty...

Page 28: ...28 Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 NOTES APPROVED UNCONTROLLED DOCUMENT IF PRINTED ...

Reviews: