4.0 INSTALLATION
4.0 INSTALLATION
4-10
4-10
Cheetah
Cheetah Xi
Xi Instal
Instal latio
latio n
n Manual
Manual
UL
UL S220
S2203
3
Rev
Rev 9,
9, 10/2016
10/2016
P/N:
P/N: 06-356
06-356
FM
FM
4.13
4.13 CONNECT
CONNECT AC POWER
AC POWER TO
TO THE
THE CONTROLL
CONTROLL ER
ER
a
a
WARNING
WARNING
AC power connections
AC power connections to the
to the Cheetah Xi
Cheetah Xi Controller must be
Controller must be
made with the main power breaker locked out.
made with the main power breaker locked out.
The following general steps shall
The following general steps shall be used to connect AC power to the
be used to connect AC power to the controller:
controller:
1.
1. Remove t
Remove the (P1)
he (P1) terminal block
terminal block from th
from the Cheetah
e Cheetah Xi board
Xi board
2.
2. Connect wiring f
Connect wiring from the prim
rom the primary transformer
ary transformer to the cont
to the controller’s AC X
roller’s AC XFMR terminal (P
FMR terminal (P1) as shown
1) as shown in
in
Exhibit 4-10, making sure to land wires to
Exhibit 4-10, making sure to land wires to correct terminal.
correct terminal.
3.
3. If the
If the optional supplemental power
optional supplemental power supply is present
supply is present, install wiring
, install wiring from the
from the secondary transfo
secondary transformer to
rmer to
the SPS AC XFMR terminal (P21) as shown in Exhibit 4-10, making sure to
the SPS AC XFMR terminal (P21) as shown in Exhibit 4-10, making sure to observe correct polarity.
observe correct polarity.
4. Do
4. Do
NOT
NOT
energize the AC power source at this time!
energize the AC power source at this time!
SPS
SPS
Exhibi
Exhibi t
t 4-1
4-10:
0: AC
AC Power
Power Connecti
Connecti ons
ons
Caution
Caution
The transformer input should never be connected
The transformer input should never be connected
to
to the
the battery
battery input.
input.
Reversing
Reversing the
the AC
AC and
and
Battery input will damage the controller.
Battery input will damage the controller.