6 |
P a g e
Figure 1.
Assembly Drawing Model H2O-2000
Operation
When installation is complete,
the unit will fill up with water
and shut off when the tanks are
full. Plug the unit in to an outlet
and press the cold/hot faucets
until a steady stream of water
comes out.
Figure 2.
Faucet operation
*Make sure the tanks are filled
with water before continuing to
the next step.
Turn on the hot/cold switches
located on the back of the cooler.
Both hot/cold elements will begin
chilling and heating the water
inside the unit. Indicator lights will
also illuminate of the front of the
cooler.